Ltd. annual output of 20,000 sets of three-phase rare earth permanent magnet synchronous motor technology transformation project environmental assessment" full public announcement


Ltd. (National Environmental Assessment Certificate No. 1994) to prepare the environmental impact report form for the project. In order to listen to the opinions and requirements of enterprises, institutions and individuals in the project area on the environmental protection of the construction project, the full version of the environmental impact report form is now publicized.

Ltd. annual output of 20,000 sets of three-phase rare earth permanent magnet synchronous motor technology transformation project environmental assessment full public announcement

Ltd. (National Environmental Assessment Certificate No. 1994) to prepare the environmental impact report form of the project. In order to listen to the opinions and requirements of the enterprises, institutions and individuals in the project area on the environmental protection of the construction project, the full environmental impact report form is hereby publicized.

I. Project name and overview

Project name: 20,000 sets of three-phase rare earth permanent magnet synchronous motor technical transformation project

Project nature: technical transformation

Construction site: Wanghu Village, Qidu Town, Wujiang District (Qidu Town Chuangju Road)

Project Profile: East: Wujiang Fengshun Copper Co., Ltd. and Wujiang Zhongling Elevator Co., Ltd. in order; South: Chuangju Road and Hongtong Pipe Industry in order; West: Suzhou Junling Mechanical and Electrical Co. There are no residents within 300 meters of this project.

II. Possible impact of the construction project on the environment

1、Exhaust gas: The project's exhaust gas is mainly the particulate matter generated in the spraying process, VOCs from the curing process and fuel exhaust gas from the burning of natural gas in the curing oven.

2、Wastewater: No industrial wastewater is generated in the project; no new employees will be added to the project, and no new domestic wastewater will be generated.

3、Solid waste: The solid waste during the operation of the project mainly consists of trimmings, waste plastic powder, waste oil, waste oil drums and waste activated carbon.

4、Noise: The noise of the project mainly comes from the mechanical noise generated by the operation of production equipment.

Third, the construction project proposed to take environmental management measures

1、Exhaust gas

The project's exhaust gases are mainly particulate matter from the spraying process, VOCs from the curing process and fuel exhaust from the burning of natural gas in the curing oven. Particulate matter generated in the spraying process is treated by a two-stage tandem pulse cartridge recovery device and then discharged in the workshop; VOCs from the curing process are treated by an activated carbon adsorption device and then discharged through a 15m high (1#) exhaust; soot, SO2 and NOx from natural gas combustion are directly discharged through a 15m high (2#) exhaust.

2、Wastewater

No industrial wastewater is generated in this project; no new employees will be added to this project, so no new domestic wastewater will be generated.

3、Noise

The noise source of this project can meet the standard of "Environmental Noise Emission Standard for Industrial Boundary" (GB12348-2008), and no noise nuisance will be caused by taking control measures such as sound insulation, vibration damping and reasonable layout.

4、Solid waste

The solid wastes in the production process of this project are mainly the trimmings, waste plastic powder, waste oil, waste oil drum and waste activated carbon. Among them, the trimmings and waste plastic powder are collected by the enterprise and sold; waste oil, waste oil drum and waste activated carbon are entrusted to qualified units for treatment. The destination of solid waste of the project is clear, zero emission, no secondary pollution to the environment, and less impact on the surrounding environment.

IV. Key points of the environmental impact assessment conclusions proposed in the environmental impact report form

After the implementation of the pollution prevention and control measures proposed in the EIA, the pollutants can be discharged to the standard, which is in line with the principle of total control.

Through the evaluation of the environmental status quo of the area where the project is located and the environmental impact analysis of the project, it can be considered feasible from the perspective of environmental protection after the strict implementation of the pollution prevention and control measures proposed in the EIA.

The above evaluation results are made only according to the scale and layout provided by the construction party. If the construction party expands the scale, changes the process, or changes the layout, the construction party must declare for approval in accordance with the requirements of the environmental management procedures of the construction project.

V. Ways for the public to check the environmental impact report form

The public can check the full environmental impact report form of this project on this website, and if necessary, request more relevant supplementary information from the construction unit or evaluation unit by email, telephone, fax, letter, etc.

VI. Scope of public opinion and main matters

The public participation survey of this project is mainly for the public living around the project. If the public has any opinions on the environmental protection of the construction project, they can submit them to the construction unit and the EIA unit, and leave their names, contact information, and contact addresses.

The main opinions of the public include the current situation of local environmental quality, the degree of understanding of the project, the degree of impact of the construction and operation of the project on working life, the attitude towards the construction of the project and other opinions and suggestions.

VII. Specific forms of public opinion solicitation

The public can give feedback by telephone, fax, letter, e-mail, etc., or directly to the construction unit or the contact person of the EIA unit, and give feedback in person.

(1) The construction unit contact information

Unit name: Jiangsu Jiuzhi Electric Co.

Location: Wanghu Village, Qidu Town, Wujiang District

Contact: Huangfu Huifang Contact: 13862538860

(2) The name and contact information of the environmental impact assessment organization

Environmental impact assessment unit: Suzhou Qingquan Environmental Protection Technology Co.

Certificate No.: National Environmental Assessment Certificate B No. 1994

Address: Building 5, No. 117 Zhujiang Road, Suzhou High-tech Zone (Room 301, Block B)

Contact Person: Xu Qinglei

Tel: 0512-66061225

【Note】:Please try to provide detailed contact information when the public expresses their opinions.

Public announcement during the construction unit will provide relevant information for the announcement query, access services.

Jiu Zhi Mechanical and Electrical Report Draft.pdf
 

 

项目,环境,影响,建设